products & Services
Products
- Pile Capacity 1 to 25 Ton
- Pile Length from 2 m. to 25 m.
- Fast and Clean Installation
- No Vibration, No Spoil Removal and Minimize Excavation Work
- Immediate Loading - No Concrete Curing Time
- Reusable, Best for Temporary Work
- Instant Torque-to-Capacity Monitoring for Quality Control
- Compatible with Modular Steel Foundation
- Hot dipped galvanized to ASTM A153 and A123 Thickness >100um.
- Helix Pile Engineered follow ICC AC358 Standard
- FLEXIBILITY: Engineered to fit different layouts with an expandable design. Additionally, compact build and mobility is a significant benefit.
- COST: Engineered to come pre-assembles for reducing on-site installation and commissioning. Thus, reduction of time and labor will result in significant cost savings.
- SAFETY AND ENVIRONMENT: Engineered to be contained within tamperproof metal enclosures to eliminate environmental hazards and also, enhance personnel safety due to reducing live parts exposed to the public.
- FOOTPRINT: Engineered to use little space regarding client needs. Structural base allows for assembled unites to be lifted, transported, and easily relocated.
- Reduce flushing time
- Increase Equipment service life
- Improve Reliability
- Increase effectiveness
- Design to optimize investment cost
- Various solution for your individual installation work with safety
- Can select delivery time to optimize a product price
- Install without a hot-work permit
- Certificated for water and dust protection
Services
- Avoiding potential site revisits for missed data (office base field checking)
- Scan data can be used to validate other forms of survey quickly and efficiently
- High accuracy plans for retro fitting design work, avoiding on-site alterations and clashes
- 3D Point cloud information is accurately processed and developed into a full 3D CAD model
- Schedule Efficiency: A quick shutdown or turnaround period, MDEC modular concept can be constructed much faster than conventional construction.
- Cost Reduction: On-site indirect costs can be reduced including construction supervision, consumable, etc. Off-site labor cost is also cheaper than on-site construction.
- Quality: Easy to manage and control conditions, permanent established workforce and skilled worker.
- Risk and Safety Reduction: Minimizing risk effecting other plant operations during a construction. Less congestion and plant traffic.
- New design exchangers
- Rating existing heat exchangers
- Process Optimization
- Technical consultant and provide the solution
- Tube vibration analysis
- Manpower supply for review the results
- Expertise in various exchanger types , shell and tube,condenser, Thermosiphon reboiler, kettle reboiler, Air cooler heat exchanger and etc.
- Ensuring that pressure surges are within design allowable
- Sizing and locating surge suppression equipment
- Calculate hydraulic dynamic forces on pipes for pipe stress analysis
- Troubleshooting existing systems to examine the cause of operational problems
- Piping Failures and Risk Assessments
- Piping Failures Analysis
- Identify the Root Causes of Piping Failures
- Piping Failure Prevention
- Recommend Methods to Correct Future Similar Failures
- Acoustic-Induced Vibration (AIV) Analysis
- Finite Element Analysis (FEA)
- Flow-Induced Turbulence (FIT) Analysis
- Flow-Induced Vibration (FIV) Analysis
- Multiphase and Slug Flow Analysis
- Pipe Stress Analysis
- Piping Vibration and Integrity Assessment
- Small-Bore Connections (SBC) Assessment
- Understanding and knowledge of ageing-related damage mechanisms, including benchmarking of the consequences of damage mechanisms into macroscopic behaviour of materials and structures under applicable conditions
- Predictive models to extrapolate behaviour of systems, structures or components up to a defined time
- Qualified methods for detection and surveillance of ageing degradation
- Qualified mitigation, repair and replacements measures
- Reliable plant documentation, including optimisation of the ageing management programme based on current understanding and knowledge and periodic self-assessment